|

Rehabbed 6 ton skid mounted LIQUID CARBONIC STYLE CO2 receiver
|
Includes: remove sheet metal on sides, repair insulation as needed,
re-cover insulation with pre-painted white aluminum sheets, repaint
existing aluminum heads, install new 1.5" Copeland R-404A
refrigeration unit with new LCR style electrical controls for
automatic operation, new single bleeder, new dual Taylor ASME
safeties (sized for outdoor installation), new Jamesbury stainless
steel ball valves on one each 1" vapor balance and 1.5" liquid
fill lines (w/CGA fittings and hose blow-down valves), and 1" vapor
and liquid process lines and three 1/2" instrument isolation valves,
rebuilt Barton liquid level indicator, new pressure indicator,
fabricate sheet metal cover over new refrigeration unit and complete
check out with all controls set for proper operation.
National Board #39854 |
|

REFURBISHED 6 TON SKID AMERIGAS STYLE
CO2 RECEIVER
| Price includes: Remove sheet metal
jacket, check and repair insulation as needed, re-cover sides
with aluminum sheets, repaint heads and leg supports, install
new 1.5 HP Copeland R-404A refrigeration unit, Cutler Hammer
electrical panel wired for automatic operation with fused
disconnect, new single bleeder, new dual ASME safeties (sized
for outdoor installation), new Jamesbury stainless steel ball
valves on one each 1" vapor balance and 1.5" liquid fill lines
(w/CGA fittings and hose blow-down valves), and 1" vapor and
1" liquid process lines (w/CGA fittings and hose blow-down
valves), and 1" vapor and 1" liquid process lines and three
1/2" instrument isolation valves, rebuilt Barton liquid level
indicator, new pressure indicator, fabricate cover over the
refrigeration unit and complete check out with all the
controls set for proper operation.
National Board #19321 |
|
|

REFURBISHED 6 TON SKID
MOUNTED CO2 RECEIVERS WITH 9KW PRESSURE BUILD VAPORIZERS
| Includes: Remove sheet metal jacket,
check and repair insulation as needed, re-cover sides with
aluminum sheets, repaint heads and leg supports, new oak
insulators under tank supports with new hardware as needed,
install new 1.5 HP Copeland R-404A refrigeration unit with new
electrical controls for automatic operation, new single
bleeder, new dual ASME safeties (sized for outdoor
installation), new Jamesbury stainless steel ball valves on
one each 1" vapor balance and 1.5" liquid fill lines (w/CGA
fittings and hose blow-down valves), and 1" vapor and 1"
liquid process lines and three 1/2" instrument isolation
valves, rebuild existing liquid level indicator, new pressure
indicator, recover control cabinet with pre-painted white
aluminum sheets with new hardware. Includes refurbished
9kw pressure build vaporizer mounted inside the cabinet.
Complete check out with all controls set for proper operation.
This unit was built new by Carbo Tech in the early 90's.
National board #2406 PENDING SALE and
#12748 |
|

REFURBISHED 6 TON VERTICAL
VJ
| Taylor Wharton style - Includes pressure vessel built to
the ASME code with a 350 PSI MAWP, carbon steel outer jackets,
new or recertified dual safeties (sized for outdoor
installation), new bleeders, vacuum checked and sealed below
150 microns, new or rebuilt level and pressure indicators, new
valves to include the liquid fill, vapor balance and liquid
and vapor process lines, CGA fittings with hose blow down
valves, 3" pressure indicator, rebuilt 6" Barton level
indicator, completely tested before shipment with liquid
carbon dioxide in the vessel.
National board #41768 |
|
|

ReHABBED 14 ton
skid mounted CO2
RECEIVER
|
Tomco "C" Style - Price
Includes:
remove sheet metal jacket, check and repair
insulation as needed, re-cover sides with aluminum sheets, repaint
heads and supports, new oak insulators under tank supports with new
hardware as needed, install new 2 HP Copeland R-404A refrigeration
unit with new electrical controls for automatic operation, new dual
single bleeder, new dual ASME safeties (sized for outdoor
installation), new Jamesbury stainless
steel ball valves on one each " vapor balance and 1.5" liquid fill lines
(w/CGA fittings and hose blow-down valves), and 1" vapor and 1" liquid
process lines and three 1/2" instrument isolation valves, rebuild
existing liquid level indicator, new pressure indicator, recover
control cabinet with pre-painted white aluminum sheet with new
hardware and complete check out with all controls set for proper
operation.
National Board #1003
|
|
|
REHABBED 14 VERTICAL VACUUM JACKETED CO2 RECEIVER
Converted to vacuum jacket service by Fiba Cryogenics
| Price includes: Pressure vessel
built to the ASME code with a 335 PSI MAWP, carbon steel outer
jackets, new or recertified dual safeties (sized for outdoor
installation), new bleeders, vacuum checked and sealed below
150 microns, new or rebuilt level and pressure indicators, new
seal kits in all existing extended stem ball valves to include
the liquid fill, vapor balance and liquid and vapor process
lines, CGA fittings with hose blow down valves, 4.5" pressure
indicator, rebuilt 6" Barton level indicator, completely
tested before shipment with liquid carbon dioxide in the
vessel. National Board #2471 |
|
|

Rehabbed 14 ton
Horizontal VJ
Converted to vacuum jacket service by
ACME Cryogenics
|
Price Includes:
Pressure vessel built to the ASME with a 335 PSI MAWP, carbon steel outer jackets, new or recertified
dual safeties (sized for outdoor installation), new bleeders, vacuum
checked and sealed below 150 microns, new or rebuilt level and
pressure indicators, new seal kits and all existing extended stem
ball valves to include liquid fill, vapor balance and liquid and
vapor process lines, CGA fittings with hose blow down valves, 4.5"
pressure indicator, rebuilt 6" Barton liquid level indicator,
completely checked with liquid carbon dioxide in the vessel.
National Board #290 |
|
|

REHABBED 14 ton
vertical CO2 Receiver
|
Taylor Wharton/Amerigas
Price includes: remove aluminum sheets off
sides, repair the insulation as needed, recover with pre-painted
aluminum sheets, repaint heads and leg supports, install new 2 HP
Copeland R-404A refrigeration system. Cutler Hammer electrical
controls with fused disconnect, motor starter, Allen Bradley
pressure switch, control voltage relay and all other controls
necessary for automatic operation, new dual bleeders, new or rebuilt
dual ASME safeties (sized for outdoor installation), new Jamesbury
Eliminator stainless steel ball valves on one each 1" vapor balance and
1.5" liquid fill lines (w/CGA fittings and hose blow-down valves), and
1" vapor and 1" liquid process lines and three /2" instrument isolation
valves, rebuild existing Barton liquid level indicator, new pressure
indicator, recover control cabinet with pre-painted white aluminum
sheets with new hardware. Complete check out with all controls
set for proper operation.
National Board #25 |
|
|

REHABBED 26 ton CO2 Receiver
|
Includes: Remove aluminum sheets off sides, repair the
insulation as needed, recover with prepainted aluminum sheets,
repaint heads and leg supports, install new 3HP Copeland R-404A
refrigeration system. New Cutler Hammer electrical controls
with fused disconnect, motor starter, Allen Bradley pressure switch,
control voltage relay and all other controls necessary for automatic
operation, new dual bleeders, new or rebuilt dual ASME safeties
(sized for outdoor installation), new Jamesbury Eliminator stainless
steel ball valves on one each 1" vapor balance and 1 1/2" liquid
fill lines (w/CGA fittings and hose blow down valves), 1" vapor and
1" liquid process lines and three 1/2" instrument isolation valves,
rebuild existing Barton liquid level indicator, new pressure
indicator, recover control cabinet with pre-painted white aluminum
sheet. New hardware and complete check out with all controls
set for proper operation.
National Board #744 |
|
|

ReHABBED 30 ton horizontal carbon dioxide storage receiver
|
Price includes: Repair insulation as needed, cover sides with
prepainted white aluminum sheets, repaint heads and saddles, install
new Copeland 3HP R404A refrigeration unit with a new Cutler Hammer
electrical panel wired for automatic operation, new dual bleeders,
new dual ASME safeties (sized for outdoor installation), new
Jamesbury stainless steel ball valves on 1 each 1" vapor balance and
1 1/2" liquid fill lines (w/CGA fittings and hose blow down valves),
and 1" vapor and 1" liquid process lines and 3 each 1/2" instrument
isolation valves, rebuild existing liquid level indicator, new
pressure indicator, recover fold down refrigeration cabinet and
complete check out with all controls set for proper operation.
National Board #1301 460 volt/3 ph
Can ship in one week
|
|
|

ReHABBED 30 ton carbon dioxide receiver
Tomco C style
|
Price includes: Remove aluminum sheets off
sides, repair the insulation as needed, recover with prepainted
aluminum sheets, repaint heads and leg supports, install new 3 HP
Copeland R404A refrigeration system. New Cutler Hammer
electrical controls with fused disconnect, motor starter, Allen
Bradley pressure switch, control voltage relay and all other
controls necessary for automatic operation, new dual bleeders, new
or rebuilt dual ASME safeties (sized for outdoor installation), new
Jamesbury eliminator stainless steel ball valves on 1 each 1" vapor
balance and 1 1/2" liquid fill lines (with CGA fittings and hose
blow down valves), and 1" vapor and 1" liquid process lines and 3
1/2" instrument isolation valves, rebuilt existing Barton liquid
level indicator, new pressure indicator, recover control cabinet
with prepainted white aluminum sheets with new hardware and complete
check out with all controls set for proper operation.
National Board #103 |
|

REFURBISHED 35 TON VERTICAL CO2 RECEIVER
| Includes: Remove aluminum sheets off
sides, repair the insulation as needed, recover with
pre-painted aluminum sheets, repaint heads and leg supports,
new dual bleeders, new or rebuilt dual ASME safeties (sized
for outdoor installation), new Jamesbury Eliminator stainless
steel ball valves on one each 1" vapor balance and 1 1/2"
liquid fill lines (w/CGA fittings and hose blow-down valves),
1" vapor and 1" liquid process lines and three 1/2" instrument
isolation valves, rebuilt Barton liquid level indicator, new
pressure indicator, install new 3 HP Copeland R-404A
refrigeration system, Cutler Hammer electrical panel wired for
automatic operation with fused disconnect. The system
will be tested and all controls set for proper operation.
NB: 46 and 42 |
|
|

ReHABBED 50 ton skid mounted CO2
Receiver
|
Price includes: Remove aluminum sheets off sides,
repair the insulation as needed, recover with prepainted aluminum
sheets, repaint heads and leg supports, install new 6HP Copeland
R404A refrigeration system. New Cutler Hammer electrical
controls with fused disconnect, motor starter, Allen Bradley
pressure switch, control voltage relay and all other controls
necessary for automatic operation, new dual bleeders, new or rebuilt
dual ASME safeties (sized for outdoor installation), new Jamesbury
Eliminator stainless steel ball valves on 1each 1" vapor balance and
1" liquid fill lines (with CGA fittings and hose blow down valves),
and 1" vapor and 1" liquid process lines and 3" instrument isolation
valves, rebuilt existing Barton liquid level indicator, new pressure
indicator, recover control cabinet with prepainted white aluminum
sheets with new hardware and complete check out with all controls
set for proper operation.
National Board #26, 702, 2905 and 2934
|
|
|

REHABBED 50 ton horizontal CO2
receiver
BUILT BY LUBBOCK FOR LIQUID CARBONIC
|
Price Includes: Pressure vessel built per the ASME code with 280
psig maximum allowable working pressure, remove aluminum sheets off
sides, repair the insulation as needed, recover with pre-painted
aluminum sheets, repaint heads and supports as needed, new dual
bleeders, new or rebuilt dual ASME safeties (sized for outdoor
installation), new Jamesbury Eliminator stainless steel ball valves
on one each vapor balance and liquid fill lines (w/CGA fittings and
hose blow-down valves), and vapor and liquid process lines and three
instrument isolation valves, rebuild existing Barton liquid level
indicator, new pressure indicator, fabricate separate
refrigeration control cabinet which includes a new 6 HP Copeland
R-404A refrigeration system and new Cutler Hammer electrical control
panel with fused disconnect, motor starter, Allen Bradley pressure
switch, control voltage relay and all other controls necessary for
automatic operation and complete check out with all controls set for
proper operation
National Board #2040
NOTE: The price includes placing the tank in vertical position and
testing the refrigeration system, instruments and all valves with
liquid carbon dioxide in the vessel for a minimum of 48 hours.
After testing, the refrigeration charge (R-404A) will be pumped into
the reservoir and sealed off. The lines will be cut and capped
for shipment. Connecting the system on site will be done by
others and requires connecting all lines, pulling a vacuum on all
lines, opening the service valves to release the charge, monitoring
the system during the first few cycles to insure everything is
running perfectly. Some fine tuning may be required as actual
conditions may differ from test conditions. If this work is
not done properly it could result in problems that are beyond our
control. Therefore, it should only be performed by a qualified
refrigeration technician. |
|
PLEASE NOTE:
Pictures show basic style of
receivers offered. Actual receivers may vary slightly in appearance.
All receivers tested before shipment with all controls set for proper
operation. Vaporizers not included unless noted, but are available.
All receivers subject to prior sale and availability. Data reports
available upon request.
Static Receivers
Home Page
infoatcarbotech.com
|